Brazilian Mines and Energy Minister Edison Lobao speaks to workers at the inauguration of the Petrobras P51 platform near Angra dos Reis, Brazil, Oct. 8, 2008. The P51 is the first semi-submersible platform, touted as the world's largest, made entirely in Brazil. (Australfoto/Douglas Engle)
Brazilian Mines and Energy Minister Edison Lobao speaks to workers at the inauguration of the Petrobras P51 platform near Angra dos Reis, Brazil, Oct. 8, 2008. The P51 is the first semi-submersible platform, touted as the world's largest, made entirely in Brazil. (Australfoto/Douglas Engle)
Camera: Canon (Canon Eos 40d) |
Original size: 2592px x 3888px |
Current: 200px x 300px |
Other sizes:
Small
•
M •
L •
O |
filename: 20081008_platform_08 |
Copyright © 2006 / 2007 - Austral Foto • Todos os direitos reservados •